As more and more people become concerned about the potential global warming effects of hydropower and the other environmental concerns arising from constructing huge dams and flooding vast swathes of land, there is increased interest in run of river hydro-electricity generation. These smaller projects could not differ more from £multi-billion mammoth construction projects such as that undertaken building the 22.5GW Three Gorges Dam and hydroelectric power plant in China.

Microhydro flow of river hydropower in Exmoor

Run of Water hydro projects use the natural downward flow of rivers and micro turbine generators to capture the kinetic energy carried by water. Typically water is taken from the river at a high point and gravity fed down a pipe to a lower point where it emerges through a turbine generator and re-enters the river. Installation of such a system is relatively cheap and has very little environmental impact.

Pictured below is an example of some simple pipework used to take water downhill to a microhydro turbine in a power generation project in India.

Water piped downhill for a microhydro power system in Africa

Such systems offer long operational life-times in excess of 25 years with minimal maintenance. The most electricity is generated in the winter when it is needed for heating and extra lighting. The payback time for small grid connected systems is often just a few years at the best locations, and under 10 years for most. And, electricity generation is far more consistent than with wind or solar power systems since power is generated 24 hours a day 365 days of the year.

3kW micro hydro turbine

Find out more about hydro-electric power with our Introduction to Hydro-Electric Power, or click here to find out about the benefits of Pico Hydro (<5kW) electricity generation particularly for remote regions in the developing world.

Below is a video presenting a run of river hydro power system in a creek in British Columbia, Canada in which water flows into pipes and runs downhill through kilometre long pipes to a pelton turbine generator. No water is held behind a dam, and all the water which is captured is returned to the creek downstream after it passes through the turbine. The environmental impact of this system is minimal, and the electricity generated powers a whole ski resort in Whistler.

Comments

Run of river hydropower invariably requires a dam; even one of 50cm can block upstream migration just as much as 50m. And lots of other issues such as depleted reaches and impacts on dowstream migration. As the Hydropower Reform Society says “r-o-r hydro has all the impacts of large hydro without the economic or energy gains.”